GunWilli wrote:
Well, I got it moved. It was only about 3 feet but it's moved.
More details...
I set up a series of crossing 4x4 as you can see in the pictures. Using a floor jack ($14.99) I lifted the end in the direction I wanted to move the tub. Don't forget wood or something under the jack.
On the opposite I used two 4x4 (one for the left hand and one for the right) under the tub support like levers. Lifting the 4x4's allowed the tub to roll on the jack about 4 inches at a time. I tried 1 4x4 but couldn't balance the load.
I checked the load often and listened for "bad sounds". I walked between the levers and jack about 100 times checking it.
All in all the tub moved smoothly and is out of the way.
Again, all comments/questions are welcome
But the Egyptians didn't have PVC pipe. LOL. If the ground is fairly level, you can use PVC pipe under the tub after you raise it up enough to get them started. Then as you roll it along, remove the first pipe and reinstall under the tub to continue rolling.